Highway Management Building with other units.

“Within the scope of (Artvin) Branch Office Facilities Construction, Guest House, Lodging, Workshop, Anbar, Guard Box, Fuel Station construction work.”
new
  • Client
    Turkish Highway Management
  • Completion
    2015
  • Type
    New Facilities Building
Facilities
Project Details

Construction of the 102nd (Artvin) Branch Office Facilities of the 10th Regional Directorate of Highways, which will be established on the existing Branch Office site located in Artvin Province Central Çayağzı District. All construction related to branch additional facilities (guesthouse-housing, workshop, warehouse, information building and retaining wall, infrastructure and existing administrative building-guesthouse connection), mechanical, sanitary, electrical installation works and the demolition of old buildings in the area where the buildings will be established.

INFRASTRUCTURE- LANDSCAPE, REINFORCED CONCRETE MANUFACTURING, FACADE MANUFACTURING, ROOF MANUFACTURING, FLOORING, WALL MANUFACTURING, DOOR MANUFACTURING, WINDOW MANUFACTURING CONSISTS OF CEILING COVERING, RETAINING WALL, FIXED FURNITURE, SPECIAL MANUFACTURING.

The job I worked as a Site Control architect

Land Area: 5680M2, Total Closed Area:1760M2.

During the implementation phase of these productions, the detailed solutions of the problems in the construction of the works with 258 construction work items were drawn and made by the relevant contractor. Project and other Additional productions that appeared in the application area of butcher construction, which are not manufactured in the tender documents, were obtained by obtaining the approval of the administration. to the relevant company

Payment of additional prices has been made. The construction application of all productions specified in the projects and additional tender documents in the construction of the relevant tender, the application It was ensured that the control was carried out in accordance with the technique.

Preparing the relevant documents of the progress payments of the productions to the company and making the payments, discovery of the additional productions and metrics were calculated. When deemed necessary, studies have been carried out to carry out the implementation in accordance with the technical specifications with detailed and additional projects.

It has been made ready for the use of the relevant administration by completing the works in accordance with the construction technique and making the provisional acceptance.