Telekom building renovation for Türk Telekom Company

“Taking into account the purposes of the project of the Provincial Directorate Building, it was completely completed in the application area and maintenance and repair were carried out.”
  • Client
    Türk Telekom
  • Completion
    2009
  • Type
    Restoration
Project Details

Türktelekom A.Ş / Artvin Province Center / Arvin Telecom Provincial Directorate Central Powerhouse Renovation Project Work. New concept design proposals have been prepared due to the fact that the Provincial Directorate Building cannot serve the conditions of the day in its old form. 1/500 site plans, -1/200-1/50 implementation projects, 1/20-1/10 detail projects, for which the most appropriate design proposal was determined by negotiating with the relevant units, The specifications, site list and Exploration price were calculated, the tender was made by taking the relevant consents.

Ceiling cladding, doors and windows, filling work, roof and insulation work, floor coverings, glass, wall, cladding, stairs, facade work / time recording, billing and payments / acceptance by the builder / official acceptance

Türktelekom A.Ş/Artvin City Center /Artvin City Center /Artvin Çoruh Provincial Telecom Building Renovation Work. Taking into account the purposes of the project of the Provincial Directorate Building, maintenance and repair were carried out by completing it completely in the application area.

made Manufactures. CEILING COATING WORKS, DOOR WINDOW WORKS, GENERAL CIVIL WORKS, FILLING WORKS, ROOF AND INSULATION WORKS, FLOOR COATING WORKS, GLASS WORKS, CLOTHING FACADE WORKS, WALL AND COVERING WORKS, DOOR WINDOW WORKS, STAIR WORKS, FACADE WORKS, IT CONSISTS OF MANUFACTURING.

My job as a Construction Site Control architect

Land Area: 250 M2, Total Closed Area: 1232 M2.

The detailed solutions of the problems that arise during the implementation phase of the productions were drawn and made by the relevant contractor. By obtaining the approval of the administration, the additional productions in the project and other tender documents, which are not produced in the construction application area, are obtained. productions have been made.

It was ensured that the payment of additional prices to the relevant company was made. In the construction of the relevant tender, the construction application of all constructions specified in the projects and additional tender documents, in accordance with the technique of the application. control has been provided.

Preparing the relevant documents of the progress payments of the productions to the company and making the payments, calculations of the estimates and quantities of the additional productions has been made.

When deemed necessary, studies have been carried out to carry out the implementation in accordance with the technical specifications with detailed and additional projects. production It has been made ready for the use of the relevant administration by completing the works in accordance with the technique and making the provisional acceptance.

Basic determination / preliminary design; site plan M 1:500 / draft; 2 variants scale 1:200/ Estimate of costs / input plans M 1:100 / work planning M 1:50 and M 1:20, as well as detailed plans M 1:10 / specifications, tender and participation in the award