School with 24 Classrooms

“The works were completed in accordance with the construction technique and the temporary acceptance was made and made ready for the use of the relevant administration.”
school in Turkey
Project Details

Türktelekom A.Ş/Türktelekom A.Ş/Giresun Province / Şebinkarahisar Province / Giresun Şebinkarahisar Primary School 24 Classrooms (MEB-20 04.49) Construction Supply Work.

The work done in the form of a social responsibility project, tendered by the Central Ankara General Directorate, was carried out by the Regional Directorate where we worked. It is foreseen that the control work will be done by the institution I work for.

In line with the Application Projects, details, specifications and place lists, 24 classes and other units depending on the classes are gymnasium, workshops, It consists of experimental classes and environmental arrangement.

Made Products. SEWAGE, RAIN WATER, LANDSCAPE WORKS, CEILING WORKS, DOOR WINDOW WORKS, GENERAL CONSTRUCTION WORKS, FILLING WORKS, ROOF AND INSULATION WORKS, FLOOR COATING WORKS, GLASS WORKS, FACADE WORKS, WALL AND COVERING WORKS, GENERAL CONSTRUCTION WORKS, FILLING WORKS, STAIR WORKS, FACADE WORKS, CABINET-BANK WORKS CONSIST OF MANUFACTURING.

My job as a Construction Site Control architect

Land Area: 19906 M2, Total Closed Area: 6336 M2.

The detailed solutions of the problems that arise during the implementation phase of the productions were propagated and made by the relevant contractor. By obtaining the approval of the administration, the additional productions in the project and other tender documents, which are not produced in the construction application area, are obtained. productions have been made.

It has been ensured that the payment of additional prices to the relevant company is made. In the construction of the related tender, all constructions specified in the projects and additional tender documents were made in accordance with the construction application technique. The productions and progress payment documents were prepared, the payments were made, the estimates and quantities of the additional productions were calculated. Necessary Studies have been carried out to make the implementation in accordance with the technical specifications with detailed and additional projects when seen. suitable for construction technique

It has been made ready for the use of the relevant administration by completing the works and making their provisional acceptance. It has been delivered to the relevant unit for use after receiving temporary acceptance and official approvals.

Project handover to executing companies/construction management for services: sewerage, rainwater, landscaping, ceiling work, door and window work, spatula work, roof and insulation work, flooring work, glass work, facade work, wall and cladding work, spatula work, staircase work, facade work, cabinet construction/detailed drawings for Adjustments/time recording, service billing and payments/acceptance by the client.