Highway Management Building with other units.

“Within the scope of (Gümüşhane city) Branch Office Facilities Construction, Guest House, Lodging, Workshop, warehouse construction work.”
new
  • Client
    Turkish Highway Management
  • Completion
    2015
  • Type
    New Facilities Building
Facilities
Project Details

Construction of 10th Regional Directorate of Highways, 101. (Gümüşhane) Branch Office Facilities, branch facilities to be built on the site (administrative building, lodging building, guest house) Building, workshop, warehouse, porch building, information building, infrastructure and landscaping works) covers all civil, mechanical, sanitary and electrical installation works. all construction related mechanical, sanitary, electrical installation works, landscaping works, infrastructure works, retaining walls, etc.

SEWAGE, RAIN WATER, LANDSCAPE WORKS, CEILING WORKS, DOOR WINDOW WORKS, GENERAL CIVIL WORKS, FILLING WORKS, ROOF AND INSULATION WORKS, FLOORING WORKS, GLASS WORKS, FACADE WORKS, WALL AND COVERING WORKS, DOOR WINDOW WORKS, STAIR WORKS, FACADE WORKS, CABINET, BANK WORKS CONSIST OF MANUFACTURING.

The job I worked as a Site Control architect

Land Area: 12,546,80 M2, Total Closed Area: 6118 M2.

Although the excess of excavation works of the facility installation site area made it difficult to carry out other works, the productions with 194 construction work items were in the application phase. The detailed solutions of the problems were drawn and made by the relevant contractor. The annex in the project and other tender documents, which is not produced in the application area of ​​ançak construction It was ensured that the productions were made by obtaining the consent of the administration. It was ensured that the payment of additional prices to the relevant company was made. in the making of the relevant tender

The construction application of all productions specified in the projects and additional tender documents, and the control of the application in accordance with the technique have been ensured. The productions made preparation of the relevant documents of the progress payments to the company and the calculations of the estimates and quantities of the additional productions were made. Details and additions as needed

Studies have been carried out to ensure that the implementation of the projects is carried out in accordance with the technical specifications. By completing the works in accordance with the construction technique and making the provisional acceptance made ready for the use of the relevant administration.