Türk Telekom Service Center Renovation in Gümüşhane/TURKEY
Made Products. CEILING COATING WORKS, DOOR WINDOW WORKS, GENERAL CIVIL WORKS, FLOOR COATING WORKS, GLASS WORKS, CLADDING FACADE WORKS, WALL AND COVERING WORKS, STAIR WORKS CONSIST OF MANUFACTURING.
Land Area: 781.6 M2, Total Closed Area: 2400 M2.
It was ensured that the payment of additional prices to the relevant company was made. In the construction of the relevant tender, the construction application of all productions specified with the projects and additional tender documents, the control of the application in accordance with the technique made has been provided. Preparing the relevant documents of the progress payments of the productions to the company and making the payments, calculations of the estimates and quantities of the additional productions has been made. When deemed necessary, studies have been carried out to carry out the implementation in accordance with the technical specifications with detailed and additional projects. Within the scope of the project, design and material changes and spatial differences were checked in order to make them in accordance with the project.
In the control phase, the deficiencies were corrected. It has been ensured that the contractor company is paid over the progress payment price. regarding the provisional acceptance made available to the administration