Kızlar Monastery in Turkey
Cleaning of wild plants in the entrance stair, courtyard and exit stair of Trabzon Kizlar monastery, in the viewing terraces, in the church chapel and other open areas, narrow, deep excavations on the surface of soft and hard grudges at all depths by hand on the surface, transporting the material. Opening of the existing drainage channels, removal of blockages and defects. Production of natural stone floors in the courtyard and connecting stairs. Production of the terrace floor of the substructure of the viewing terraces made of hard natural wood.
Completion of some of the demolished walls from rubble and stone blocks. D1, D2 blocks are filled with hydraulic lime mix fill material which is machine injected into the walls and the walls are reinforced. C The block floor cleaning is carried out and the 4-storey 550 m2 steel construction system is installed independently of the existing walls.
Roof trusses, roofing, roof insulation and Alaturka tiles. Completion of light, sound and sanitary productions. Production of steel stairs and glass railings. Floor Wooden floors and ceiling wood coverings. Manufacture of glass facades and floor coverings with spider holders. Making wooden windows and doors, repairing windows. Excavating and cleaning the stacked floor and materials of the Kaya Church. Cleaning of the ceiling surfaces according to the rules of restoration and micro-injection. Scanning the church with a 3D laser scanner Draw plans, sections and elevations of 3D scans as architectural survey projects and send them to the institution
The job I worked as a site control architect is administrative building, bell tower, rock church, chapel, ruins of residential buildings and environmental impact, land area: 2850 m2 , total closed area production: 1100 m2. The projects and detailed solutions to the problems encountered during the manufacturers' implementation phase, involving 122 civil and electrical works throughout the building, have been drawn and handed over to the relevant units.
Additional manufacturers in the project and other tender documents not manufactured in the field of stub construction were approved by the administration and the manufacturers were manufactured. It was ensured that the payment of additional prices was made. The construction application of all the impacts specified in the tender documents has been controlled according to the technique of application. For the preparation of the progress payments of the manufactured productions and the execution of the payments, the estimate and the amounts of the additional productions were calculated. The work was completed in accordance with the civil engineering and prepared for the requests of the responsible administration by early acceptance.
It was established on the slope of Boztepe, in a position that dominates the city. The monastery complex, built on two terraces, was surrounded by a high protective wall. Monastery III. It was established during the reign of Alexios (1349-1390) and has been repaired several times and took its solid shape in the 19th century. Firstly, it consists of a rock church with holy water in the south, a chapel at its entrance and a few cells. Inside the rock church, there are inscriptions and portraits of Alexios III's wife Theodora and his mother Eirene.