Trabzon Türk Telekom SMC building renovation

“All communications within the building's communications sector it is aimed to establish a new unit in order to see the fault etc systems instantly. Interiors that were previously used for a different purpose It was demolished and completely manufactured for the fault monitoring center system.”
  • Client
    Türk Telekom
  • Completion
    2010
  • Type
    Renovation
house in munich
Project Details

Made Products: CEILING COVERING WORKS, DOOR WINDOW WORKS, GENERAL CIVIL WORKS, FLOOR COVERING WORKS, GLASS WORKS, WALL AND COVERING WORKS, STAIR WORKS, ACRYLIC FURNITURE MANUFACTURING.

The Total Covered Area of my job as a Construction Site Control architect is: 240 M2.

Since it is for special purposes, the use of special materials has been very high. the construction of these productions and the solution of new details were applied. Due to the service provided by the building to the communication sector, due to the rapid development of the new communication sector and the interior spaces of the building in various ways. to be made in accordance with the design and to continue to be used by being renewed.

Continuing to use the building by renewing the interior and exterior spaces in various ways due to the rapid development of the communication sector. Architectural project-details of productions such as renewal of wet floors, system hall floor covering changes, exterior thermal insulation, etc. Repairs and repairs were carried out in accordance with the specifications and specifications.

The detailed solutions of the problems that arise during the implementation phase of the productions were drawn and made by the relevant contractor. By obtaining the approval of the administration, the additional productions in the project and other tender documents, which are not produced in the construction application area, are obtained. manufactures have been made.

It was ensured that the payment of additional prices to the relevant company was made. All projects and additional tender documents specified in the construction of the relevant tender. The construction application of the constructions is ensured to be controlled in accordance with the technique of the application. Preparing the relevant documents of the progress payments of the productions to the company and making the payments, calculations of the estimates and quantities of the additional productions has been made.

When deemed necessary, studies have been carried out to carry out the implementation in accordance with the technical specifications with detailed and additional projects. production It has been made ready for the use of the relevant administration by completing the works in accordance with the technique and making the provisional acceptance.

Project handover to executing companies/construction management for services: demolition work, suspended ceilings, windows and doors, floor laying, insulation, facade work/detailed drawings for adjustments/time recording, service billing and payments/acceptance by the client/official acceptance.