Türktelekom A.Ş/Trabzon Province Shuttle

“Telecom Directorate Building with Customer Services Concept Project Application and Maintenance and Repair and Remodeling Business.”
  • Client
    Türk Telekom
  • Completion
    2010
  • Type
    Maintenance
house in munich
Project Details

Türktelekom A.Ş/Trabzon Province Center /Trabzon Kanuni (Shuttle 1) Telecom Directorate Building with Customer Services Concept Project Application and Maintenance and Repair and Remodeling Business. It started with the production of the following written productions.

1.Wall, concrete etc. demolition work is required.

2.Partition wall plastering and painting works have been done for the construction of the 2nd quarters.

3. Due to the change of location, the plaster and paint of the place to be made are made of ceramics.

4.It is made of artificial marble.

5. The reason for including the Transformer place in customer services in the existing ground floor customer services and purchasing the machine energy unit that is requested to be built on the 3rd floor With the site changes made with the company, it is necessary to manufacture plasterboard walls, suspended ceilings, gypsum plaster, satin paint and aluminum door glass production.

6. In the existing ground floor customer services, due to the fact that the transformer location is included in the customer services, there are two entrance doors and these doors have more space. Photocell door should be made because it is made in accordance with the concept without holding it.

7. Due to the changes in the materials used in the customer service concept project, which exist within the current Project, the composite stone minha Special granite ceramic should be made instead.

8. Required productions that exist within the current Project and which have subsequently been removed due to changes in the customer service concept project has been added.

9. Granite ceramic and suspended ceiling should be made instead of PVC production, which is thought to be done in the repartitor area.

10. Since the windows desired to be built in the current project are above the suspended ceiling, therefore, the windows have been lowered in distance and the remaining part is betopan. covered with material.

11. Insulation is required since there is a moisture and water problem on the wall of the repartitor room.

12. Profiles are used in places where the height of the plasterboard wall productions is high. Making a platform for the hair condenser placed on the roof, Antirust and paint are required.

13. The new concept ladder and materials have been changed and the excess manufacturing has been minimized. New concept materials has been added.

Within the communication sector of the building, the interiors of the building, which were previously used for a different purpose, were demolished and in accordance with the project, specifications and tender documents. has been repaired. It was applied by making these productions and solving new details. Delivering the completed work to the relevant unit by paying the contractor's dues.

Project handover to executing companies/construction management for services: wall, plaster, paint, suspended ceiling, door and window, screed, marble, PVC flooring, outdoor area,/detailed drawings for adjustments/time recording, billing of services and payments/acceptance by the client/official acceptance.